data center for Boguchany Dam

Hi,

 I am developing a project of module data center for Boguchanskaya HPP (Boguchany Dam):

-          That must be high scalable infrastructure

-          Cooling by water from Dam and reserve cooling by outside Siberian air

-          electric power supply from Boguchanskaya HPP (Boguchany Dam)

-          reserve electric power supply from Hydrogen Fuel Cell Power Modules

-          Hydrogen Generator for suppling the Fuel Cell Power Modules (Angara water to Hydrogen by electrolysis)

 

Can you help me to evaluate:

-          Project cost

-          required equipment

-          required area

-          electricity consumption

-          water consumption

The scale of these:

250 racks

2500 racks

5000 racks

50000 racks

 

How many units in each rack, 50U?

Please use plain text.
Respected Contributor
TarunJain
Posts: 369
Registered: ‎02-28-2007
Message 2 of 2 (504 Views)

Re: data center for Boguchany Dam

Hi DmitriyBond ,

Many more inputs and efforts would be required to estimate

-          Project cost

-          required equipment

-          required area

-          electricity consumption

-          water consumption

 

I don't think so that it such a laborious task could be addressed in the forum

You should take a paid expert opinion from a decanter consultant for this :D

Cheers,

Tarun Jain