I just read the quickspecs of BL420c G8, it says that mezzanine 1 is connected to bays 3&4 and mezzanine 2 is connected to bays 5&6 (or to bays 5,6,7/8 for quad port mezzanines). What does happen when this blade server is used in a c3000? Can I use mezzanine slot2?

 

Thanks in advance.

Honored Contributor
Robert_Jewell
Posts: 1,239
Registered: ‎06-26-2001
Message 2 of 2 (130 Views)

Re: Hp Gen8 and C3000, question about paths

You can:

 

  • Mezzanine slot 2 ports 1 and 3 are routed to bay 3
  • Mezzanine slot 2 ports 2 and 4 are routed to bay 4

 

Check out the c3000 Service Manual from this site:

http://h18004.www1.hp.com/products/blades/components/c-class-tech-maintaining.html

 

...and go the section "Interconnect Bay Numbering".

 

-Bob