Track effort and capacity based on role in the team (design versus development)

Additional reporting capabilities should be added so that the Scrum Master can track effort based upon the team member's role in the sprint. Allow a role to be determined at the task level, or even the team member level that will be visible during burn down charting, capacity planning, etc. It is important to our planning efforts that we are able to track design and development role capacity.